November 19, 2026

Jordan officially launched the “National Transport” project to desalinate Red Sea water and transport it from Aqaba to the capital, Amman, at a total cost of $6.6 billion, in a strategic step aimed at confronting the water scarcity crisis and enhancing the water security of the Kingdom, amid disagreements with Israel over additional water supplies.
The project is considered one of the largest infrastructure projects in the history of Jordan, as it aims to produce 300 million cubic meters of drinking water annually, covering about 40% of the country’s needs, with water pumping actually starting by the end of 2030.
The project includes establishing a central seawater desalination plant in the Gulf of Aqaba, extending a 417-kilometre pipeline to Amman, in addition to establishing pumping stations and solar energy facilities with a capacity of 300 megawatts to cover about 30% of the project’s electrical needs.
The launch of this step comes in light of a severe water crisis that the Kingdom is suffering from, as the annual per capita quota does not exceed 60 cubic metres, compared to the extreme water poverty line of 500 cubic metres. The project is likely to contribute to raising the per capita share to about 110 cubic metres, and increasing the days of water supply from one day to three days per week.
On the political level, the project coincides with the faltering renewal of the agreement to supply Jordan with additional quantities of water from Israel, which provided for the provision of 50 million cubic meters annually under an agreement concluded in 2021. In this context, the Jordanian government confirmed that not renewing the agreement will not affect the Kingdom’s water rights stipulated in the 1994 peace treaty, indicating that alternative measures will be taken to ensure the continuity of supplies.
In terms of financing, the project relies on a partnership between the government and the private sector, with the support of 23 donors and international financing institutions, with the project being fully owned by the state 26 years after its start of operation.
Despite its great importance, the project faces several challenges, including the cost of desalination and the high rate of water loss, which reaches about 41%, which requires modernizing distribution networks and reducing leakages.
Experts confirm that the “National Carrier” represents a strategic shift in the Jordanian water sector that contributes to reducing dependence on external supplies, but it will not eliminate the crisis completely in light of continuing climate pressures, population growth, and the increasing demand for water.